TxDOT Weekly Road Work Report

befunky-design-21-2

Courtesy of Pixabay

Here is the latest Weekly Road Work Report from the Texas Department of Transportation for August 23rd through the 29th.

Bowie County

I-30 – From FM 989 to Arkansas State Line, widening highway. Construction work will begin on shoulders with most of the work being conducted at night.

SH 8 – At Sulphur River, replacing bridges.

SH 93 – Between Meadow Lane and Kennedy Lane, installing sidewalks.

Camp County

None

Cass County

SH 8 – At Sulphur River, replacing bridges.

Harrison County

US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

SH 43 – From Loop 390 to Haggerty Creek, repairing and resurfacing highway.

Loop 390 – From US 59 to SH 43 North, repairing and resurfacing highway. Road closed to through-traffic, detour route is signed.

FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.

Marion County

US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

Morris County

SH 49 US 79 – From FM 31 to Mill Creek, seal coating highway. – From Titus County Line to FM 144, repairing and resurfacing highway.

Panola County

SH 149 – At SH 315, constructing overpass and widening highway.

US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.

SH 149 – From FM 124 to FM 959, seal coating highway.

Titus County

SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.

SH 11 – At Piney Creek, repairing bridge.

Upshur County

None

Tags: , ,