TxDOT Weekly Road Work Report

befunky-design-2019-10-22t123731-254

Courtesy of Pixabay

Here is the latest Weekly Road Work Report from the Texas Department of Transportation for November 15th through the 21st.

Bowie County

I-30 – From FM 989 to Arkansas State Line, widening highway. Reconstructing and widening highway. Eastbound traffic moved to the outside lanes.

SH 8 – At Sulphur River, replacing bridges.

SH 93 – Between US 82 and US 67, installing sidewalks.

SH 98 – At Anderson Creek, replacing bridge. All traffic restricted to one lane with signal lights controlling traffic through work zone.

Camp County

None

Cass County

SH 8 – At Sulphur River, replacing bridges.

US 59 – In Queen City and south of Linden, repairing concrete pavement.

Harrison County

US 59 – From FM 1997 to Marion County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

FM 1186 – From US 59 to Panola County Line, installing safety end treatments on culverts.

Marion County

US 59 – From 1.5 miles south of FM 2208 to Harrison County Line, repairing and resurfacing highway. Traffic restricted to one-lane each direction.

Morris County

SH 49  – From Titus County Line to FM 144, repairing and resurfacing highway.

Panola County

US 79 – From SH 149 to Rusk County Line, repairing and resurfacing highway.

US 59 (NE Loop) – From US 59 North to US 79 East, repairing and resurfacing highway. On and off ramps at US 59 and NE Loop closed, traffic detoured accordingly.

SH 315 – From West Loop in Carthage to Rusk County Line, installing safety end treatments on culverts.

Titus County

SH 49 – From FM 1735 to Morris County Line, repairing and resurfacing highway.

Upshur County

None

Tags: ,